Sold out
Roll over or click image to zoom in
1.Carbon reduction cost savings RMB 300+
2.Production cost slashed by 60% (saving RMB 1800)
3.Maintenance time shortened by 90% (only 20 minutes)
4.Annual charging cost savings of RMB 800+ (20,000 km)